    Water Main Improvements Project

Project Description

GARDEN ISLES WATER MAIN REPLACEMENT project includes:

  • Replacement of existing infrastructure with new ductile iron pipe (DIP) water main and associated fittings, valves, service lines, fire hydrants, and appurtenances by CES Construction.
  • Installation of sewer point of service cleanouts to those properties lacking them.
  • Restoration of all areas disturbed by construction activities, including, but not limited to: Roadways; Driveways; Sidewalks; Existing utilities; Irrigation; Sodding; Landscaping; Mailboxes; Light poles; and Pavement striping.
  • Pressure testing, bacteriological testing, and density testing.

TIMELINE

Phase 1 improvements have been completed and included Hickory Drive, East of Larch Avenue, Oak Street and Locust Street. Phase 2 consist of Hickory Drive west of Larch Avenue, Larch Avenue and Larch Court. Phase 2 improvements are currently underway and are anticipated to be completed early 2023. Phase 3 includes Magnolia Street and Magnolia Court and is anticipated to be completed by mid-2023.

CES Construction Logo

Location and Boundary

All water mains within the Garden Isles development. (see adjacent image).

Frequently Asked Questions

Contact Us

If you’d like more information about this project, please use the form below to get in touch.

You may contact the Public Involvement Manager using the information below:

Cheryl Scott
The Merchant Strategy, Inc.,
561-215-9322
Info@themerchantstrategy.com